Town Of Richfield NY Forward
ARTCADTEC provided 3D Renderings for multiple locations, showcasing the main scope of work as part of the Town of Richfield’s Strategic Investment Plan requirements.
ARTCADTEC provided 3D Renderings for multiple locations, showcasing the main scope of work as part of the Town of Richfield’s Strategic Investment Plan requirements.
ARTCADTEC provided 3D Renderings from multiple vantage points, showcasing the main scope of work, including the Proposed Overall View, Hunts Point Avenue Crossing, Bryant Avenue Pedestrian Bridge, and Bruckner Sheridan Interchange as part of the project’s contract bidding requirements.
ARTCADTEC provided 3d Renderings of existing and proposed conditions, including construction planning sequences and design iterations for viability and community outreach in multiple areas along Park Avenue between 129th & 115th street.
ARTCADTEC provided 3D Renderings of both, existing and proposed conditions from multiple vantage points, showcasing the main scope of work, including the Atlantic Avenue Bridge, Double Deck Bridge, Main Line 1-3 and Service Roads as part of the project’s contract bidding requirements.
ARTCADTEC provided 3D Renderings for the Brookfield Village project, a mixed-use development that offers housing on the second and third floors and retail on the first floor. Multiple views were rendered showcasing the (4) buildings and overall views with common areas.